Our 5-Step Process
We've refined our process over 2,500+ installations to be as smooth and transparent as possible.
Free Consultation
30–60 minutesWe start with a no-pressure call or site visit. We'll review your last 12 months of electric bills, assess your roof's sun exposure using satellite imagery, and discuss your goals — savings, backup power, or both.
Custom System Design
1–3 business daysOur engineers create a detailed 3D model of your roof and design a system optimized for your energy usage, shading, and aesthetic preferences. You'll receive a proposal with expected production, savings, and financing options.
Permits & Approvals
2–4 weeksWe handle every form, filing, and approval. This includes city building permits, HOA architectural review (if applicable), and your utility's interconnection agreement. You don't fill out a single paper.
Installation Day
1–3 daysOur certified crew arrives with everything needed. Most residential installations take 1–3 days. We protect your landscaping, keep the site clean, and treat your home with respect.
Inspection & Activation
1–2 weeksThe city inspector reviews our work, your utility swaps your meter for a net meter, and we flip the switch. You start generating clean power immediately. We'll also walk you through the monitoring app.
Total timeline from contract to activation: 4–8 weeks on average